28 December 2011

Captain Joe (I mean Engineer Joe) has scheduled his ankle surgey for 17 February, he will be laid up a minimum of 8 weeks, plus physical and mental therapy.  Departure date is hereby changed to ??????

26 November 2011

The Planned Route, departing from Atchison, Kansas on or about 1 April 2012, arriving in Barkley Lake, Green Turtle Bay Marina 10 days later.  Total distance:  Missouri River 422 miles, Mississippi River 198 miles, Ohio River 59 miles, Cumberland River 31 Miles:  Total this Phase 710 Miles.

31 October 2011

Taking time off

Joe and I needed a rest from planning, so we went to Hawaii and visited Jessica!
So here we are watching the sea turtle
And then we were Snorkeling

And Then Preparing to Fish

Us Fishing (Not)
Preparing to Luau

25 October 2011

Finished installing the Lowrance HDS-8 with dual fuel sensors.  Works fantastic.  Radar arrives later this week.

20 October 2011

Name Update

Before:

We needed to make the name clearer and larger for when someone want to hails us as they are about to run us down!

After: